INSPIRE-5Gplus - INtelligent Security and PervasIve tRust for 5G and Beyond

Start: 01 November 2019
End: 31 October 2022
Funding: European
Status: Ongoing
Code: H2020-ICT-2019
Objective: The goal of INSPIRE-5Gplus is to advance security of 5G and Beyond networks via two main approaches: (1) by leveraging/extending existing security assets and end-to-end liability management between parties, and (2) by introducing novel solutions and paradigms exploiting the potential of new trends including AI/ML and Blockchain.
Website:  https://5g-ppp.eu/inspire-5gplus
Budget:  6M€

FIREMAN - Framework for the Identification of Rare Events via Machine Learning and IoT Networks

Start: 01 May 2019
End: 30 April 2022
Funding: European
Status: Ongoing
Code: CHIST-ERA (call 2017)
Objective: FIREMAN aims to design, develop and showcase a novel big-data based framework that encompasses all steps from sensing and data acquisition to statistical analysis and operational decisions, to accurately identify, detect, forecast and prevent rare events in industrial physical processes.
Website: https://fireman-project.eu/
Budget: 1M€ 

5GCroCo - 5G Cross-border Control

Start: 01 November 2018
End: 31 October 2021
Funding: European
Status: Ongoing
Code: 5GPPP Phase III Project -
Contract: H2020-825050
Objective: 5G-PPP phase III project, aimed at trialing 5G technologies for cooperative, connected, and automated driving in cross-border scenarios
Website: https://5gcroco.eu/
Budget:  
Publications

SPOT5G - Single Point of attachment communications heterogeneous mobile data networks

Start: 01 January 2018
End: 31 December 2020
Funding: National
Status: Ongoing
Code: TEC2017-87456-P
Objective: SPOT5G aims at contributing to the design of an innovative communications architecture which can break the performance limitations of the currently loosely inter-connected, resource-fragmented and isolated operation of the mobile network ecosystem.
 Budget:  
Publications

5GCAR - Fifth Generation Communication Automotive Research and innovation

Start:  01 June 2017
End:  31 May 2019
Funding: European
Status: Ongoing
Code: 761510
Objective: 5GCAR aims to become a true enabler of V2X applications which are not perfectly realizable due to the limitations in current vehicular communications
Website: https://5gcar.eu/
Budget:  
Publications

IoTWORLD® - IoTWORLD

Start: 21 December 2015
End: 31 December 2018
Funding: Internal
Status: Ongoing
Objective: IoTWORLD is an End-to-End testbed for the Internet of Things. With a scalable design, IoTWORLD integrates a variety of heterogeneous wireless technologies and allows for end-user involvement. 
Website: http://iotworld.cttc.es
Budget:  
Publications

CellFive - Virtual Small Cells for Spectral and Energy Efficient Communications in 5G Networks

Start: 01 January 2015
End: 30 June 2018
Funding: National
Status: Due
Code: TEC2014-60130-P
Objective: CellFive aims to design and demonstrate a new line of next generation small cells that deliver ubiquitous, cost-effective and high speed connectivity at any time and at any place to support 5G services. 
Budget:  
Publications

P2P-SMARTEST - Peer to Peer Smart Energy Distribution Networks

Start: 01 January 2015
End: 01 January 2018
Funding: European
Status: Due
Code: Grant number 646469
Objective: P2P-SmartTest investigates and demonstrates a smarter electricity distribution system integrated with advanced ICT, regional markets and innovative business models.
Website: http://www.p2psmartest-h2020.eu/
Budget:  
Publications

ADVANTAGE - Advanced Communications and Information processing in smart grid systems

Start: 01 January 2014
End: 31 December 2017
Funding: European
Status: Due
Code: FP7-607774
Objective: ADVANTAGE is an inter-disciplinary and inter-sectoral ITN Marie Curie action between power and communications engineering research and development communities.
Website: http://fp7-advantage.eu/
Budget:  
Publications

CowTracker - Development of an IoT device to track and monitor cows

Start: 01 July 2017
End: 15 December 2017
Funding: Industry
Status: Due
Objective: CowTracker aims to design and implement an IoT device for remotely monitoring the movements and the status of cows. 
Budget:  

METRO-LINK - Desarrollo de un Sistema de Comunicaciones para el Control de Apertura Automática de Puertas en Metro

Start: 01 April 2016
End: 01 July 2017
Funding: Industry
Status: Due
Objective: METRO-LINK aims to design and implement a wireless sensor network for subway trains and station platforms which enables the opening operation of automatic doors. 
Budget:  

MOTEC - Desarrollo de un Gateway para el Acceso Remoto Seguro a Sistemas controlados por PLC

Start: 01 January 2016
End: 28 February 2017
Funding: Industry
Status: Due
Objective: MOTEC aims to design and implement a software application for Android devices to provide remote and secure access to programmable logic controllers from maintenance computers.

SOSRAD - 77 GHz Substrate Integrated Waveguide (SIW) System on Substrate (SoS) Radar Front-End

Start: 01 February 2013
End: 31 January 2016
Funding: National
Status: Due
Code: TEC2012-39143
Objective: SOSRAD aims at introducing substrate integrated waveguide technology (SIW) as a leading system-on-substrate (SoS) technology for the implementation of cost-effective, high performance millimeter wave circuits and systems.
Budget:  
Publications

SWAP - Symbiotic Wireless Autonomous Powered system

Start: 01 August 2010
End: 31 July 2014
Funding: European
Status: Due
Objective: SWAP aims at providing a novel sensor board consisting of 1) a high efficiency RF transceiver 2) a low power micro controller 3) an energy accumulator and 4) a modular harvesting system
Website: http://fp7-swap.eu/
Budget:  
Publications

GREEN-T - GREEN Wireless Terminals

Start: 01 May 2011
End: 30 June 2014
Funding: European
Status: Due
Code: TSI-020400-2011-16
Objective: GREEN-T aims at providing innovative solutions for enabling power saving for multi-standard mobile terminals in heterogeneous wireless systems. 
Budget:  
Website: http://greent.av.it.pt/
Publications

CoupleETC - Coupled Enhanced Turbo Codes Demodulator and Decoder

Start: 01 October 2012
End: 30 April 2014
Funding: European
Status: Due
Objective: CoupleETC aims at satisfying the demanding requirements of future planetary missions in terms of received low signal power and high data rate, requiring improved synchronization, demodulation and decoding schemes.
Budget:  
Publications

SGR-RC - Suport als Grups de Recerca, “Grup de Tecnologies de les Comunicacions Ràdio”

Start: 03 August 2009
End: 31 December 2013
Funding: Catalan
Status: Due
Code: Project code: 2009SGR1046
Budget:  
Publications

2009 SGR 940 - Wireless communications networks and access technologies

Start: 03 August 2009
End: 31 December 2013
Funding: Catalan
Status: Due
Budget:  
Publications

CO2GREEN - Cooperative and Cognitive Techniques for Energy-Efficient Wireless Communications

Start: 01 January 2011
End: 31 December 2013
Funding: National
Status: Due
Objective: CO2GREEN aims to study cooperative and cognitive techniques to reduce the energy consumption of wireless communications.
Budget:  
Publications

EXALTED - EXpAnding LTE for Devices

Start: 01 September 2010
End: 28 February 2013
Funding: European
Status: Due
Objective: EXALTED aims to provide pervasive and trusted network and service Infrastructures for M2M communications.
Budget:  
Publications

BuNGee - Beyond Next Generation Mobile Broadband

Start: 01 January 2010
End: 30 June 2012
Funding: European
Status: Due
Code: ICT-FP7-248267
Objective: BuNGee aims to dramatically improve the overall infrastructure capacity density by an order of magnitude (10x) to an ambitious goal of 1Gbps/Km2 anywhere in the cell – thereby removing the barrier to beyond next-generation networks deployment.
Website: http://www.ict-bungee.eu
Budget:  
Publications

GASP - Guardian Angels for a Smarter Planet

Start: 01 May 2011
End: 30 April 2012
Funding: European
Status: Due
Objective: The “Guardian Angels for a Smarter Life” (GA) FET Flagship aims to create energy-efficient, smart, electronic personal companions that will assist human beings from infancy to old age.
Budget:  
Web: http://www.ga-project.eu
Publications

NARRA - Novel Architectures for Reconfigurable ReflectArrays and phased array antennas

Start: 01 January 2008
End: 31 March 2012
Funding: National
Status: Due
Code: TEC2008-02685/TEC
Objective: GASP aims to investigate novel architectures of reconfigurable, electronically scanned reflectarrays in radar applications and satellite communications.
Budget:  
Publications

R2D2 - Road to media-aware user-Dependant self-aDaptive NETWORKS

Start: 01 January 2010
End: 31 March 2012
Funding: National
Status: Due
Code: TSI-020400-2009-72
Objective: R2D2 aims to work towards fitting the triple-play (IP-TV, IP-Telephony and Internet) services into communication networks, which have been so fardesigned to just provide plain broadband connectivty.
Budget:  
Publications

OPEN MAC

Start: 01 February 2011
End: 31 January 2012
Funding: Industry
Status: Due
Objective: OPEN MAC aims to introduce a new design approach to overcome the limitations of the state-of-the-art implementation of MAC protocols either using off-the-shelf Network Interface Based Platforms or custom made hardware solutions based on Field-Programmable-Gate-Arrays (FPGAs) processors.
Budget:  

AT4WIRELESS - Development of TDD-LTE Physical Layer

Start: 01 May 2009
End: 31 December 2011
Funding: Industry
Status: Due
Budget:  
Publications

NEWCOM++ - Network of Excellence in Wireless Communications++

Start: 01 January 2008
End: 30 April 2011
Funding: European
Status: Due
Code: 216715
Objective: NEWCOM++ aims to scientifically address medium/long term, complex, interdisciplinary, fundamental research problems in the field of wireless networks, focused towards identifying, posing in the right modelling perspective, and at least partially characterizing the information-communication theoretical limits.
Web: https://newcom-project.eu/
Budget:  
Publications

DaVinci - Design and versatile implementation of non-binary wireless communication based on innovative LDPC codes

Start: 01 January 2008
End: 30 June 2010
Funding: European
Status: Due
Code: FP7-ICT-2008-216203
Objective: DaVinci aims at developing new transmission technologies targeting future 4G wireless broadband systems. 
Web: http://www.ict-davinci-codes.eu/
Budget:  
Publications

XALOC - Sensors Networks for the Management of Public Parkings and LOCation

Start: 26 June 2009
End: 26 June 2010
Funding: Catalan
Status: Due
Website: http://xaloc.cttc.es
Budget:  
Publications

PERSEO - Cooperative and cross layer techniques for wireless sensor networks

Start: 01 October 2006
End: 01 October 2009
Funding: National
Status: Due
Code: TEC2006-1 0459/TCM
Objective: PERSEO aims to contribute to technical innovation by exploiting the potential of cooperative transmission and cross-layer techniques for wireless sensor networks.
Budget:  
Publications

LOOP - Coexistence and optimization for LTE-RAN and WAN

Start: 01 July 2007
End: 31 December 2008
Funding: European
Status: Due
Code: FIT-330215-2007-8
Objective: LOOP aims to address interoperability/coexistence solutions, specifically between 3GPP LTE RAN and WAN (WiMAX and WLAN) to ensure their competitive position in the market and to have coexistence solutions in place for eventual commercial launch
Budget:  
Publications

PlaNetS - Platforms for Networked Service delivery

Start: 01 January 2005
End: 31 January 2008
Funding: European
Status: Due
Code: FIT-330225-2007-14
Objective: PlaNetS intends to contribute to the overall goal of eEurope 2005, to provide cost effective broadband access to all European citizens.
Budget:  
Publications

R@ilnet - Mobile Internet access system for railway users

Start:  01 January 2004
End:  30 October 2007
Funding: National
Status: Due
Code: FIT-330301-2004-04.
Objective: R@ilnet aims to define and develop the technology and equipment that is necessary for the bidirectional internet access in trains, with minimum terrestrial infrastructure
Budget:  
Publications

RX-POS - High-accuracy positioning system

Start: 01 September 2005
End: 01 September 2007
Funding: Industry
Status: Due
Objective: RX-POS is devoted to the study and development of an antenna array receiver for positioning with high accuracy (less than 1 cm) in the 433 MHz band
Budget:  
Publications

NEWCOM - Network of Excellence in Wireless Comunications

Start: 01 March 2004
End: 28 February 2007
Funding: National
Status: Due
Code: IST-2002-507525
Obective: NEWCOM aims at creating a European network that links in a cooperative way a large number of leading research groups addressing the Strategic Objective “Mobile and wireless systems beyond 3G”, a frontier research area of the Priority Thematic Area of IST
Web:  http://newcom.ismb.it/
Budget:  
Publications
­